Case Study

혁신을 위한 패스트 트랙: 신제품 개발 시간 및 비용 절감

Qenos 사가 Aspen Plus®의 회분식 모델링을 어떻게 자사의 공정에 적용하여 변화하는 고객의 요구에 맞춰 플랜트 검증 단계를 최소화하고, 고객 맞춤형 제품을 신속하게 시장에 공급할 수 있었는지 실제 사례를 소개합니다.

Case Study

Refinería optimiza tren de destilados medios en tiempo real con Aspen GDOT™

Aprenda cómo una de las compañías de energía multinacionales más grandes del mundo uso Aspen GDOT en una de sus refinerías para maximizar la producción de diésel especifico y de jet. Al usar optimización en tiempo real a través múltiples unidades de APC, la refinería fue capaz de reducir en un 70% el regalo de azufre. Descargue este caso de estudio para conocer cómo puede optimizar su producción y reducir el regalo de calidad de su producto.

Case Study

Refinery Optimizes Middle Distillate System in Real Time with Aspen GDOT™

Learn how one of world’s largest multinational energy companies used Aspen GDOT to maximize production of specific diesel and jet fuel products at one of its refineries. By using real-time optimization across multiple APC units, the refinery was able to decrease sulfur giveaway by 70%. Download this case study to learn how you can optimize production and reduce product giveaway.

Case Study

创新快车道:节约新产品开发的时间和成本

了解凯诺斯公司如何借助Aspen Plus®间歇模拟,获得关于流程的宝贵见解,从而减少工厂试验和实验,保证流程响应不断变化的客户需求。

Case Study

Transforming Sales and Operations Planning at Criterion

Learn why Criterion Catalysts uses Aspen Plant Scheduler to ensure they are able to fulfill their sales demands while alerting them of inventory problems. The solution is a critical part of their monthly Sales and Operations Planning (S&OP) process, and provides them with global supply chain and inventory visibility 12 months out in the future.

Case Study

Two Looming Failures Stopped Within Two Weeks of Monitoring

Executives at this mining company were looking for a new approach to proactively handle reliability issues for critical equipment.

Case Study

UK Refinery Increases Middle Distillate Production with Aspen GDOT™

Download this case study to learn how a refinery in the UK used Aspen GDOT to increase middle distillate production by 10%. The closed loop optimization technology, adjusts multiple process units in real-time to maintain product consistency and improve overall refinery performance. Discover how you can drive more profitable operations with Aspen GDOT.

Case Study

US Railway Saves Millions by Preventing Line of Road Failures

A major transportation company responsible for delivering customer goods on time, safely and reliably, was plagued by catastrophic failures of locomotives that had gone undetected by its current reliability techniques. Using Aspen Mtell to examine data from engine lube oil samples, a leading U.S. railway was able to save millions of dollars.

Case Study

Westlake Chemical Improves Reaction Time from Hours to Minutes

Learn how Westlake assesses time sensitive supply chain opportunities, such as accepting a modified customer order, in a matter of minutes using Aspen Plant Scheduler rather than four hours using previous spreadsheet methods.

Case Study

Production Optimization of Natural Gas Pipelines & Field Production Facilities Using Performance Engineering

Learn how YPFB Andina was able to increase their gas production using an integrated model solution that was able to provide a $280M increase in revenue in 1 year.

Page 193 of 257